How to Build a Landscaping Labor Rate That Covers the Whole Hour
A $24 wage is not a $24 labor cost. Build a productive crew-hour rate, recover travel once, and turn cost into price with a worked example and copyable worksheet.
By Verdis7 min read

You pay a crew member $24 an hour. A two-person crew spends three hours on a cleanup. Charging $144 for labor would recover those six hours of wages, but it would leave nothing for employer taxes, insurance, paid loading time or the office work that made the job possible.
A landscaping labor rate starts with the cost of a productive hour, then adds the other costs and profit your price must cover. Build it before sending next season’s renewals. You need payroll totals, a realistic time budget and a clear definition of an hour.
Every dollar amount, percentage and time allowance below is illustrative. These are worksheet inputs, not recommended wages, tax rates, industry averages or a promise of margin.
Choose your unit before doing the math
A person-hour is one person working for one hour. A crew-hour is one elapsed hour for the whole crew. Two people on a site for three hours use six person-hours or three crew-hours. Both units work. Mixing them is how an otherwise careful estimate loses half its labor recovery.
The Verdis Crew Labor Cost Calculator returns the cost of one productive crew-hour. Use the crew’s average hourly wage per person and enter the crew size separately. Do not multiply the wage by the crew size before entering it. For a mixed-rate crew, average the wages of the people on that crew; do not include the same supervisor again in overhead.
Open the Crew Labor Cost Calculator
Turn wages into loaded payroll cost
Use gross wages plus the employer’s additional costs: employer payroll taxes, workers’ compensation, unemployment contributions and employer-paid benefits, as applicable. Employee tax withholding comes out of gross wages; adding it again as employer burden would count it twice. Ask your payroll provider or accountant for the costs that actually apply to your business.
For example, a $24 wage with an assumed 25% employer burden becomes $30 per paid person-hour: $24 × 1.25. That 25% is only a combined planning assumption. It is not a payroll tax rate, and your insurance and benefit costs may produce a different figure.
IRS Topic 751: employer and employee Social Security and Medicare shares (opens in a new tab)
Count overtime at its actual cost when it is part of the schedule. If you work on the crew yourself, assign your field time a replacement wage and the costs appropriate to your situation. Otherwise the estimate can appear profitable only because the owner’s labor is free. Keep owner field labor separate from office compensation.
Divide by productive hours, not every paid hour
Payroll includes time that cannot all be sold as on-site work. Loading, job-to-job travel, maintenance, meetings and paid breaks still consume the crew’s week. Track these categories without overlap, then decide how the estimate will recover them.
This worksheet spreads those costs across productive on-site hours. It is a pricing allocation, not a reason to remove time from payroll. The US Department of Labor’s hours-worked guidance identifies travel between job sites during the workday as work time. Check applicable federal and state requirements when deciding what must be paid.
US Department of Labor Fact Sheet 22: hours worked and travel time (opens in a new tab)
A two-person crew, one illustrative week
Assume both people are paid for 40 hours. The crew uses 1.5 elapsed hours per day for driving and loading over five days, plus 2.5 other paid non-productive hours per week. Those categories do not overlap. Productive time is 40 − 7.5 − 2.5 = 30 crew-hours, equivalent to 60 person-hours.
Weekly loaded payroll is 2 people × $24 × 1.25 × 40 paid hours = $2,400. Divide $2,400 by 30 productive crew-hours: labor costs $80 per productive crew-hour. The equivalent person-hour cost is $40. Neither figure includes equipment, materials, general overhead or profit yet.
To reproduce this in the calculator, enter 2 people, $24 average wage, 25% burden, 8 paid hours per day, 5 days, 1.5 drive/load hours per day and 2.5 other non-productive hours per week. Its labor result should be $80 per productive crew-hour, not an $80 selling price.
Recover travel once
In this example, travel and loading payroll are already recovered through the productive-hour rate. Do not then add those same hours to the job’s labor quantity. If you prefer to charge job-specific travel directly, rebuild the rate and time allocation so those costs are counted once. An unusually remote property still needs its own review; the route average may not cover its extra demand.
Use a season-sized budget before setting an annual rate. Paid holidays, leave, weather downtime and seasonal staffing can change the relationship between paid and productive time. If paid leave is in your payroll total and reduced productive-hour budget, do not also add the same leave cost to burden.
Build the selling rate from a complete cost
Labor cost is only one part of the estimate. Budget equipment separately, including a reasonable provision for ownership or replacement, repairs and operating costs. Allocate general overhead such as office work, rent, software and non-field supervision across the productive hours you realistically expect to sell. Remove anything already included in another category.
Continue the illustration with $15 of equipment cost and $25 of allocated general overhead per productive crew-hour. The cost to recover becomes $80 + $15 + $25 = $120. These allowances are invented for the example. Build yours from your own equipment and operating budget.
Margin and markup give different prices
For a target margin on the selling price, divide the complete allocated cost by one minus the target margin. At an illustrative 25% target: $120 ÷ (1 − 0.25) = $160 per productive crew-hour. The $40 difference is 25% of the $160 price, after the costs included in this model. It is not a guarantee of year-end profit.
Adding a 25% markup instead gives $120 × 1.25 = $150. That leaves $30, which is a 20% margin on the $150 price. Choose the target deliberately and keep taxes and costs outside the model visible. A three-crew-hour cleanup at the illustrative $160 rate contributes $480 toward its price before separately priced materials, disposal and other job-specific costs.
Build the complete estimate with the Job Pricing Calculator
Read each calculator’s unit label before carrying numbers across. If a job calculator multiplies a per-person rate by crew size, enter $40 for this example’s labor cost, not $80. Add equipment and overhead once, then apply margin once. Feeding a selling rate into a cost field and applying another margin would inflate the estimate.
Copy this labor-rate worksheet
Use one worksheet for each crew configuration or service whose costs differ materially. Record the period and the person who will review the inputs. Keep the original estimate beside the actual result so a later price change has a reason.
Inputs: wages, burden and time
Crew members: __. Average gross wage per person-hour: $__. Employer burden: __%, supported by payroll and insurance records. Paid elapsed crew-hours for the period: __. Drive/load hours: __. Other non-productive hours, with no overlap: __. Productive crew-hours = paid hours − drive/load hours − other non-productive hours: __.
Cost and price
Loaded payroll = crew size × average wage × (1 + burden as a decimal) × paid hours: $__. Labor cost per productive crew-hour = loaded payroll ÷ productive crew-hours: $__. Add equipment cost per productive crew-hour: $__. Add allocated general overhead per productive crew-hour: $__. Total allocated cost: $__. Target margin as a decimal: __. Selling rate = total allocated cost ÷ (1 − margin): $__.
Job check and review date
Estimated productive crew-hours on the job: __. Labor/equipment/overhead allowance = those hours × selling rate: $__. Separately priced materials, disposal, subcontract work and applicable taxes: __. Travel recovery method: __. Costs already included elsewhere: __. Actual hours after completion: __. Next rate review: __.
Test the rate against a normal week and a difficult one
In the same illustration, 25 productive crew-hours instead of 30 raise labor cost to $2,400 ÷ 25 = $96 per productive crew-hour. Hold the other illustrative hourly allowances fixed and total cost becomes $136; at 25% margin the selling rate would be about $181.33. If equipment or overhead budgets must also be recovered over fewer hours, recalculate those allowances too. The shorter week can cost more than this simple sensitivity shows.
Do not solve the gap by assuming the crew will suddenly work faster. Check the causes: scattered stops, equipment downtime, unclear scope or work that was never priced. A rate worksheet helps distinguish a wage change from a schedule problem; it does not tell you what a customer will accept.
For the next few completed jobs, compare the estimated crew-hours with recorded time and approved scope. Groundwork gives crews a place to record job work and time; use the records you actually have rather than assuming every payroll hour was assigned to a job. The calculator is a planning tool, not an automatic payroll or quoting integration.
See the Groundwork crew workflow
Then compare the price with the costs those jobs really incurred. Keep the estimate and the season review as separate checks: one sets the price before you commit, the other tests whether the work earned it.
Review completed work with the job profitability worksheet
Start with one regular crew and one typical service. Verify the wages and time budget, run the labor calculation, and carry a consistent unit into the estimate. You can explain a price much more clearly when you know exactly what its hour includes.