Topsoil Calculator

Work out exactly how many cubic yards of topsoil a grade, seedbed, or raised bed needs — then get the delivered cost, spreading hours, and the price you should quote the customer.

  • Cubic yards for any area and finished depth
  • Built-in settling and waste allowance
  • Spreading labor at real crew production rates
  • Delivered cost plus a margin-protected job price

Measure the area

ft
ft
in

Cost and pricing

$/cu yd
%
cu yd/hr
people
$/hr
$
%

topsoil needed

6.5cubic yards

Or about 176 bags (1 cu ft) ($572 bagged vs $248 bulk).

Area covered

480 sq ft

Material cost

$248

Install labor

4.7 hrs

Total direct cost

$556

Quote this job at

$794

Covers topsoil, delivery, and 4.7 crew-hours of install while protecting 30% margin ($238 gross profit).

Contractor note

Screened topsoil settles 10–20% after it is spread and watered in, which is why the waste allowance matters more here than with mulch. For grade work, order to finished depth plus one inch — coming back for a second half-yard delivery costs more than the extra soil.

Turn this into a branded quote, then schedule the crew and invoice on completion — without re-typing a single number.

Start free trial

Email yourself this topsoil takeoff

We’ll send the quantities, costs, and recommended job price so you can drop them straight into a customer quote.