Free · Calculator 1 min

Sod Calculator

Measure the lawn once and get the square footage, pallet count, delivered material cost, install hours, and the price you should quote — including cutting waste around beds and curves.

  • Square feet and pallet count with waste allowance
  • Delivered material cost per pallet or per sq ft
  • Install hours at real crew production rates
  • Quotable job price with your target margin

Measure the area

ft
ft

Cost and pricing

$/sq ft
%
sq ft/hr
people
$/hr
$
%

sod needed

519sq ft

Or about 2 pallets (450 sq ft) ($380 bagged vs $233 bulk).

Area covered

480 sq ft

Material cost

$233

Install labor

1.5 hrs

Total direct cost

$382

Quote this job at

$546

Covers sod, delivery, and 1.5 crew-hours of install while protecting 30% margin ($164 gross profit).

Contractor note

Order 5–10% over your measured square footage — every cut around a curve, walkway, or bed line creates a scrap piece you cannot reuse. Sod is perishable: it should be laid within 24 hours of harvest in mild weather and the same day in summer heat, so schedule the crew before you schedule the delivery.

Turn this into a branded quote, then schedule the crew and invoice on completion — without re-typing a single number.

Start free trial

Email yourself this sod takeoff

We’ll send the quantities, costs, and recommended job price so you can drop them straight into a customer quote.

Frequently Asked Questions

Ready to grow?

Modern quoting, scheduling, and invoicing for landscape crews.

14-day free trial · Setup in 30 seconds · Cancel anytime